South Park
1115 S Olive St (Mack Urban Phase 3)
The project at 11th and Olive calls for replacing a surface parking lot with a 51-story tower which would feature 536 studio, one-, two-, and three-bedroom homes above 4,178 square feet of ground-floor commercial space. Plans also call for a four-level podium and six subterranean levels containing parking for 581 vehicles.
Building Information
Status: Proposed
Number of Stories: 51
LEED Certification: Not Certified
Retail
Retail Sq Ft: 6153
Residential
Residential Type: Apartment
Market Rate Units: 536
Total Rental Units: 536
Total Units: 536